Integrated liquid cooling
Liquid cooling technologies are integrated into the flexible and scalable design of every building on the campus.
Built from the ground up for AI-native workloads, liquid cooling and high-density compute.
The SINES Data Campus integrates liquid cooling technologies into a flexible, scalable design powered by 100% renewable energy.
SIN01, the first building of the campus, already runs one of the European Union's largest NVIDIA deployments.
Rack densities supported by the NVIDIA GB300 NVL72 deployment at SIN01
NVIDIA Blackwell Ultra GPUs deployed at SIN01 by Nscale for Microsoft
NVIDIA Vera Rubin GPUs announced by Nscale, starting in late 2027
Design PUE target for the campus
In October 2025, Nscale selected Start Campus for one of the European Union's first deployments of the NVIDIA GB300 NVL72 platform, in support of Microsoft.
The deployment supports rack densities surpassing 130 kW, delivering the power and cooling required for advanced AI workloads.
In May 2026, Nscale announced an expansion with more than 66,000 NVIDIA Vera Rubin GPUs, starting in late 2027, building on over 12,600 NVIDIA Blackwell Ultra GPUs already deployed at SIN01 for Microsoft.

Liquid cooling is part of the campus design, not an add-on. SIN01's capacity was expanded in response to customer requirements through the use of liquid cooling technologies.
Liquid cooling technologies are integrated into the flexible and scalable design of every building on the campus.
Available to customers who need efficient, high-temperature liquid cooling for AI GPUs, using the campus's sea water cooling infrastructure and reducing the need for mechanical chillers.
Read the announcement →A once-through sea water circuit, reusing the infrastructure of a decommissioned power plant, is the design basis for rejecting heat at the campus.
In October 2026, Schneider Electric, AVEVA, Nscale and Start Campus piloted an end-to-end digital twin built with the NVIDIA Omniverse DSX Blueprint.
The twin simulates how a jump in rack density moves through the power train and the liquid cooling loop before it becomes a physical reality. Operator and customer can test new hardware generations, agree the configuration and build it once.
| Certification | Scope |
|---|---|
| OCP Ready v2 Hyperscale | SIN01 and SIN02, assessed by the Open Compute Project Foundation |
| LEED Gold BD+C v4 | SIN01, 75 points |
| ISO/IEC 27001 | SINES Data Campus, within the defined scope |
| SOC 2 Type II report | SINES Data Campus, within the defined scope |
| TIA Tier III design | Concurrently maintainable infrastructure |
Talk to the Start Campus team about capacity, timelines and delivery models at the SINES Data Campus.