For hyperscalers and AI clouds

AI Capacity in Europe

A 1.2 GW campus in Sines, Portugal, with grid access fully secured and room to scale.

The SINES Data Campus is purpose-built for high-density AI, cloud and HPC workloads, powered by 100% renewable energy and cooled by the Atlantic.

Scroll
At a glance

Capacity you can plan on

Grid access is the first constraint for AI infrastructure in Europe. At Sines it is already secured for the full campus.

1.2 GW

Total campus capacity, fully permitted, with grid access secured

37.5 MW

SIN01, live since Q4 2024

200 MW

Each of the next buildings, SIN02 to SIN06

100%

Renewable energy

Capacity roadmap

Six buildings, phased delivery

The campus is developed building by building. SIN01 is operational and expanding, while SIN02 to SIN06 progress through phased development and construction.

BuildingIT capacityStatus
SIN0137.5 MWOperational since Q4 2024; inaugurated in April 2025
SIN02200 MWNext facility; Nscale announced a €465 million investment in a second 200 MW building
SIN03 to SIN06200 MW eachPhased development
Campus1.2 GWLand and grid access secured for the full campus
Delivery models

From powered shell to build-to-suit

01

Powered Shell

Infrastructure with power and basic structure in place, ready to customise to your technical specifications.

02

Whitespace

Optimised open areas for rack, equipment and system installation, designed for expansion or reorganisation.

03

Turn Key

Complete, ready-to-use data center solutions, from design and construction to fully operational infrastructure.

04

Build-to-Suit

Customised projects developed, built and delivered to your unique infrastructure requirements.

See all solutions →
Why Sines

Why hyperscalers choose Sines

In November 2025, Microsoft announced a $10 billion investment in the SINES Data Campus, following strategic discussions with Nscale and Start Campus.

Power. 1.2 GW of grid access, fully secured, in a country where renewables supplied around 68% of electricity consumption in 2025.

Connectivity. Direct access to subsea cable landings connecting Europe, Africa and the Americas, carrier-neutral facilities and a DE-CIX point of presence.

Resilience. Designed to TIA Tier III, with zero disruptions during the Iberian grid outage of 28 April 2025.

Efficiency. Sea water cooling with a design PUE target of 1.1 and a WUE target of zero.

Render of the SIN02 building at the SINES Data Campus
Render of SIN02, the next building on the campus.

Looking for AI-ready capacity in Europe?

Talk to the Start Campus team about capacity, timelines and delivery models at the SINES Data Campus.

Contact us →