Powered Shell
Infrastructure with power and basic structure in place, ready to customise to your technical specifications.
A 1.2 GW campus in Sines, Portugal, with grid access fully secured and room to scale.
The SINES Data Campus is purpose-built for high-density AI, cloud and HPC workloads, powered by 100% renewable energy and cooled by the Atlantic.
Grid access is the first constraint for AI infrastructure in Europe. At Sines it is already secured for the full campus.
Total campus capacity, fully permitted, with grid access secured
SIN01, live since Q4 2024
Each of the next buildings, SIN02 to SIN06
Renewable energy
The campus is developed building by building. SIN01 is operational and expanding, while SIN02 to SIN06 progress through phased development and construction.
| Building | IT capacity | Status |
|---|---|---|
| SIN01 | 37.5 MW | Operational since Q4 2024; inaugurated in April 2025 |
| SIN02 | 200 MW | Next facility; Nscale announced a €465 million investment in a second 200 MW building |
| SIN03 to SIN06 | 200 MW each | Phased development |
| Campus | 1.2 GW | Land and grid access secured for the full campus |
Infrastructure with power and basic structure in place, ready to customise to your technical specifications.
Optimised open areas for rack, equipment and system installation, designed for expansion or reorganisation.
Complete, ready-to-use data center solutions, from design and construction to fully operational infrastructure.
Customised projects developed, built and delivered to your unique infrastructure requirements.
See all solutions →In November 2025, Microsoft announced a $10 billion investment in the SINES Data Campus, following strategic discussions with Nscale and Start Campus.
Power. 1.2 GW of grid access, fully secured, in a country where renewables supplied around 68% of electricity consumption in 2025.
Connectivity. Direct access to subsea cable landings connecting Europe, Africa and the Americas, carrier-neutral facilities and a DE-CIX point of presence.
Resilience. Designed to TIA Tier III, with zero disruptions during the Iberian grid outage of 28 April 2025.
Efficiency. Sea water cooling with a design PUE target of 1.1 and a WUE target of zero.
.jpg)
Talk to the Start Campus team about capacity, timelines and delivery models at the SINES Data Campus.